PETER SHAUGHNESSY
FINE CRAFT SCULPTURAL BOXES
Back
Specs
Foundation
Framing
Roofing
Exterior
Interior
Power, telephone and water
Moving day
The upper roofing was started first
Then the lower roof was completed
This shot was taken from the top of the backhoe
The last thing was to install the chimney before it got too cold